  Specialised Engineering » Incremental Launching Bridge Construction

The incremental launching method is particularly suited for the construction of continuous post-tensioned multi-span bridges. It consists of casting 15 m to 30 m long sections of the bridge superstructure in a stationary formwork behind an abutment to push a completed section forward with jacks along the bridge axis.

Holland Rd / Farrer Rd / Queensway Interchange, Singapore

The sections are cast contiguously, one after another, and are then stressed together. The superstructure, growing section by section is launched over temporary sliding bearings on the piers until the bridge is completed.

In order to keep the bending moment low in the superstructure during the extrusion phases, a launching nose made of steel is attached to the front of the bridge deck.


The launching nose is dismantled after the superstructure has reached the opposite abutment. However, the spans should not exceed 60 m approx. and the bridge sections must be constant. Furthermore the superstructure of the bridge has to be continuous over the whole length and straight or have a constant curvature in plan and elevation.


 
 