Industrial Ring Road, Thailand

ELEVATED HIGHWAY USING MOVABLE SCAFFOLD SYSTEM (MSS)
Owner/Client:   Public Works Dept, Ministry of Interior (Thailand)
Designers:   Epsilon Company Ltd,
Norconsult Civil Engineering Co. Ltd
Mott Macdonald Ltd
Main Contractor:   Kajima-Tokyu-Unique Joint Venture
Years of Execution:   2003 to 2005
Method of construction:   Movable Scaffold System
Project Description:

  • A high level interchange comprising a two-lane bridge of post-tensioned concrete, length 1,659m.

  • A high level, four-lane approach bridge of post tensioned concrete, length 788m.

  • A four-lane viaduct of post tensioned concrete, length 584m.

  • An interchange comprising a two-lane slip road of prestressed concrete, length 532m.
Drawings:



Another Bridge Design and Construction Project by the BBR Group