| Middle Bridge across Sg Punggol |
| Owner/Client: |
|
Housing and Development Board |
| Structural Consultant: |
|
Surbana International Consultants Pte Ltd |
| Description: |
|
Construction of a middle bridge across Sungei Ponggol in Sengkang Town and repairs of existing roads and other civil engineering works with HDB estates. The length of the bridge is approximately 375m and the longest span is 105m. |
| Location: |
|
SINGAPORE |
| Contract Sum: |
|
S$18.48 million |
| Year to be Completed: |
|
2008 |
| Contract Duration: |
|
21 months (from July 2006) |