Middle Bridge across Sg Punggol
Owner/Client:   Housing and Development Board
Structural Consultant:   Surbana International Consultants Pte Ltd
Description:   Construction of a middle bridge across Sungei Ponggol in Sengkang Town and repairs of existing roads and other civil engineering works with HDB estates. The length of the bridge is approximately 375m and the longest span is 105m.
Location:   SINGAPORE
Contract Sum:   S$18.48 million
Year to be Completed:   2008
Contract Duration:   21 months (from July 2006)