|
|
Raw Water Pipeline
(from Kallang Basin to Onraet Road)
|
| Owner/Client: |
|
Public Utilities Board |
| Structural Consultant: |
|
Camp Dresser & McKee International (S) Pte Ltd |
| Description: |
|
Construction of water pipeline of diameter 2.2m and approximately 7,000m in length. |
| Location: |
|
SINGAPORE |
| Contract Sum: |
|
S$23.6 million |
| Year to be Completed: |
|
2008 |
| Contract Duration: |
|
28 months (from June 2006) |
|
| Another Civil & Structural Engineering Project by the BBR Group |
|
BBR Building, 50 Changi South Street 1, Singapore 486126, Tel No: 6546 2280 Fax No: 6546 2268 |