| |
|
 |
| |
Specialised Engineering » Stay Cable Systems |

Putrajaya Bridge 8, Malaysia: 300 m long arch bridge
BBR has developed stay cable systems for bridge and suspended roof applications. All of them are manufactured under strict quality control conditions either in a factory or on the construction site.
Bundles of 7mm dia. wires, dia. 0.6" strands or 5mm dia. carbon fibres are encased in a UV-resistant HDPE duct and provided with fatigue resistant anchorages at both ends. Depending on the stay system, the HDPE sheath is filled with a corrosion inhibiting compound or may remain empty.
More project references:
|
|