| Putrajaya Bridge 8, Malaysia |
 |
| Owner/Client: |
|
Putrajaya Holding |
| Designer: |
|
PJS, Michael Yamout |
| Main Contractor: |
|
Road Builder - Hasrat Sedaya JV |
| Cable Supplier: |
|
BBR Malaysia, BBR System Ltd |
| Years of Execution: |
|
1998 to 2000 |
 |
Project Description:
Construction of Putrajaya bridge started in June 1998 and was completed in 2000. The bridge consists of 2 pylons which is 53 m. high and 1 arch bridge which is 32 m. high.
- The main span length is equal to 300 m.
- For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed.
- For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m.
|
| Technical Specifications: |
| Span: |
|
1 span of 300 m |
| Stay Arrangement: |
|
Double plane |
| Superstructure: |
|
Deck width: 32 m, Shape: box girder, Material: precast concrete |
| Pylon: |
|
2 pylons, Height: 53 m, Material: in situ concrete |
| Arches: |
|
Span: 300 m, Height: 32 m, Material: steel |
| Stay Cables: |
|
84 BBR CONA from 43 x 0.6" to 91 x 0.6", Total quantity: 750 t, Cable lengths: from 60 to 160 m |
| Hangers: |
|
46 BBR DINA 120 dia. 7 mm, Total quantity: 50t |