Putrajaya Bridge 8, Malaysia
Owner/Client:   Putrajaya Holding
Designer:   PJS, Michael Yamout
Main Contractor:   Road Builder - Hasrat Sedaya JV
Cable Supplier:   BBR Malaysia, BBR System Ltd
Years of Execution:   1998 to 2000
Project Description:

Construction of Putrajaya bridge started in June 1998 and was completed in 2000. The bridge consists of 2 pylons which is 53 m. high and 1 arch bridge which is 32 m. high.

  • The main span length is equal to 300 m.

  • For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed.

  • For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m.
Technical Specifications:
Span:   1 span of 300 m
Stay Arrangement:   Double plane
Superstructure:   Deck width: 32 m,
Shape: box girder,
Material: precast concrete
Pylon:   2 pylons,
Height: 53 m,
Material: in situ concrete
Arches:   Span: 300 m,
Height: 32 m,
Material: steel
Stay Cables:   84 BBR CONA from 43 x 0.6" to 91 x 0.6",
Total quantity: 750 t,
Cable lengths: from 60 to 160 m
Hangers:   46 BBR DINA 120 dia. 7 mm,
Total quantity: 50t